top of page

Embarcadero Heights

Embarcadero Facade.png
Screenshot 2025-01-21 at 12.36.02.png

Project: Embarcadero Heights

Type: Mixed-used Residential & Commercial Development

Location: Embarcadero, Philippines

Year: 2024

Embarcadero Heights (Phase A) will offer four 3-bedroom 2-storey residential units that can accommodate up to 24 people. Situated in an urban zone in the 1st class municipality of Mangaldan, it is 11.7km (29 minutes) away from the nearby city of Dagupan and 214.1km (3 hours 18 minutes) away from the capital city of Manila. The nearest airport is Clark International Airport, situated 125.2km (1 hour 58 minutes) and the closest motorway is the TPLEX accessible via Urdaneta City Junction, which

is 27.5km (44 minutes) away. There are good public transport links along the nearby National Highway 210.

The province of Pangasinan currently has a population of 3,163,190 of which 113,185 live in Mangaldan. Due to the rise in the local population, there is a sharp demand for affordable housing for young working families. The homes will be constructed with durable and sustainable materials ensuring the residents safety and comfort. The design incorporates passive daylighting and ventilation systems that are adopted from Philippine vernacular architecture. Each residential unit include a single car port to meet the legislative requirement for vehicle ownership and prevent traffic congestion along the Barangay Road.

Affordable housing . Mixed-use development . Prefab construction . Masterplanning . Suburban Regeneration . Low impact development . Low carbon living design . Modern Philippine vernacular architecture . Virtual collaboration . Concept design . Massing model & drawings Application of RIBA Stages 0-2 on an overseas project .

Screenshot 2025-01-21 at 13.02.32.png
Phase A: Residential
Screenshot 2024-11-21 184425.png

Phase A is part of the overall proposal called Embarcadero Heights for the corner lot sitting along National Highway 210 and a Barangay Road. The total project will also offer four commercial units with upper floor storage units. The plot is currently sitting empty, hence this project will help with the economic regeneration of the area. Its proximity to schools and the business district makes it ideal for young families or co-living professionals working in local trades.

Mini Portfolio DRAFT_Page_05.jpg
Mini Portfolio DRAFT_Page_06.jpg
Mini Portfolio DRAFT_Page_07.jpg
Mini Portfolio DRAFT_Page_08.jpg
Mini Portfolio DRAFT_Page_09.jpg
Mini Portfolio DRAFT_Page_10.jpg
Mini Portfolio DRAFT_Page_11.jpg
bottom of page